Showing posts with label Cervelo R3 Build. Show all posts
Showing posts with label Cervelo R3 Build. Show all posts

Sunday, November 14, 2010

Maiden Voyage...R3 and Tarmac!

Maiden Voyage
Yesterday morning I woke up and decided to email Dan to see if Zondre would be too upset if we finished the R3 build without him.  The weather was perfect, and the Nick and I were going to ride with his new bike, so I really wanted to get her done.  Thsi way we could both ride our new bikes on the same day, a HISTORIC EVENT to say the least!
Dan email back that it was going to be OK, and when I got there, he had already done most of the work.  All that was left was putting the bar tape on (deda), and the final fitting.  I was inpatient, so I tried to put the tape on myself, not my forte, and I pulled a Perk!  Of course I did it all wrong.  So Dan finished his fitting with another client, and fixed it for me, doing a figure 8 instead of the cheat strips, and the tape came of beautifully in white.


Video of the final fitting before the maiden voyage of the R3 taken by Dan at Cycling Concepts in Rocky Hill.  During the initial part of the fitting there was a awefull noice coming from the seatpost area, so Dan and I decied to take it off and cut it and grease the collar.  Before cutting the seatpost the weight of the bike was 7.18 KG and after it was 7.16 KG a whopping .02 KG difference or 20 grams.  This alone did not change the weight in LBS as it was still 15 lbs. 13 oz with cages and computer mounts.  Very light considering that was not my ultimate goal here.  I was looking for a sturdy comfortable ride and to get all Dura Ace throughout...Goal met.


From Maiden Voyage
Nick came in shortly after the final fitting and we weighed his bike at the exact same weight in Lbs, 15 lbs and 13 oz.  This was totally by accident. However, with a few changes he will make in the next couple of weeks, his bike weight will come down below mine, as I do not plan any such changes.
From Maiden Voyage
From Maiden Voyage


From Maiden Voyage
I love this picture of my Brother!  It show the joy for cycling that we both have shared since childhood, and the best part is we have always enjoyed it together, especially over this past season.  This makes all the expense of cycling worth whatever the cost!  You cannot put a price tag on a sport or healthy activity that one can share with loved ones and close friends!  Nick and I shared the experience of building our new bikes up from researching the frames and correct geometries for our respective bikes that match our riding needs and styles, to the maiden voyage with both shared.  It was an experience not soon forgotten or taken for granted!
Right after this photo my battery died on my camera, but Dan took a few shots of us after our ride with  the shop camera, that I will add to this post once received. 
Nick and I went on our maiden voyage of 15 miles from the shop to Middletown and back, mostly flat, but middletown has a couple of hills to test our resolve and our bikes.  We road up rt 99 Through Cromwell, across to Berlin and then into Middletown.  We came back RT 3 to the shop. 
During the ride, I noticed several things about the R3.  1st was that on Rt 99 I had to use a lot less effort both to spin up to speed at lights, clipping in and out of the pedals was a breeze with the Speed Play Zero Pedals, and that maintaining speed behind another rider was effortless.  When you stand on the pedals the bike just goes.  Standing and cranking up short hills seemed to use much less energy, and was extremely stiff in the BB area. I think I need to crank down the pedal float a bit, as I notice I was able to move my foot in the pedals a bit too much.  Even after a long layoff without riding, going up the hills in Middletown did not exhaust me like they did during the summer.  I never got that rapid breathing to where I had to slow down totally in 1st gear.  There was one time that a big dump truck pulled beside me and it broke my concentration and I lost momemtum.  But was able to regain it after I recovered from the exhaust.  I never used 1st gear, the closest I got was 3rd, 23 ring and same in the front.  I had never done that on that hill before.  I look forward to my follow up recovery ride today at noon.  Going to go back to CC for some Derailleur adjustments as the initial cable stretch of the Gore Ride On's will undoubtly be needed. 
After the ride, Nick and I went back to my house for a turkey dinner which was over done.  I hate over cooked turkey, dry and lifeless.  However the verggies that I baked with it were awesome!  This is what I will have upon return today,  Open faced turkey sandwich and veggies....NICE!
Here's to a great Maiden Voyage, but mostly to a great ride with my brother, time and MONEY well spent!

Friday, November 12, 2010

Cervelo R3 Build continues...

7900 Shifters and Brakes Arrive for R3
Went back to Cycling Concepts to finish the bike build, but could not get it all done as time ran out.  Could not leave work early today, and got to the shop late.  Sondre was already working on a bike when I got there, so he could not drop what he was doing to lend a hand.  So I mounted the shifters and brakes, cleaned the bars, and got the bike ready for new housing and cables. 
Dave's Bike Fit
While I was waiting, Dave and Dan were working on Dave's setup position to fix his left foot rotation angle.  They put shims in this shoes, and got his foot to track a bit better.  It facinates me how a few changes to your pedal can make such a big difference in your attach angles in the pedal stroke.  Dan broke out the laser to track Dave's knee position while pedaling.
Went back and Sondre installed all the cables, but did not have time to adjust the front and rear Derailleurs or Brakes.  I guess I have to wait until Wednesday...Maybe!

Wednesday, November 10, 2010

Dura Ace 7900 Shifters and Brakes arrive, and Dan fits a Tri-Bike..

From 7900 Shifters and Brakes Arrive for R3


Today the final pieces to the R3 puzzle arrived on my doorstep, so I rushed over after work to try to fit them on the R3 frame, to no avail.  Since Sondre was not at Cycling Concepts to explain how the shifter and brakes should be installed correctly, Dave and I decided not to tempt fate.  The 7900 shifters have all internal routing, that makes installation of the levers more intricate than I can handle myself.  There was also a question on the front brake installation that I was unsure of, so discretion is the better part of valour. 
In the middle of it all, there was a great orange hue from the sun setting over the bike shop, so save and I decided to go outside for a look, and found a new moon staring at us.  A beautiful sight for sure.  Upon returning, I found Dan in the middle of a Tri-Bike Fit for a Trinity College student.
From Tri Bike Fitting at Cycling Concepts by Dan
Dan checks the spin and hip angles, after setting the saddle height and fore and aft position.  Once the bike is fitted properly according to the riders specific body type, then the Stack and Reach can help to determine the correct frame geometry needed to accomodate the rider.  All TT and Tri-Bikes should be fitted properly before determining the correct bike frame, not the other way around according to Dan.  That make today sense to me, and can be the difference between successful riding position for mile to come.  This rider fit the P2 Cervelo over the Cannondale or the P3 or P4.  The P2 being the less expensive, and less aggressive version in the Cervelo line.  As Dr. Olcott used to say, "Proper planning prevert poor performance."  This seems to be an appropriate addage for the TT or Tri-Bike rider.
So, Friday will be, hopefully, the completion of the Cervelo R3 build up, with all Dura Ace Components throughout!  It will make me at least LOOK FAST!

Friday, November 5, 2010

R3 Build Problems...

Today was suppose to be the final day of my bike build, at least for now.  I went to CC to get the shifters set, and put on the new chain.  Then the front D would not work properly, what a downer.  I am temporarily using my old Ultegra SL Shifters with my new dura ace 7900 Front D, which apparently are not compatible with the new 7950 crank.  The chain rubs going up into the last 3 gears.  Possible solutions are to change the front D to the old ultegra SL front D, which will work as the pull on the 7900 is designed only to work with the 7900 shifters.  Or to buy the $400 Dura Ace 7900 shifters now, and float some bills for a month.  I am leaning toward the later, but have not decided yet. 
The best deal I can find on the shifters is at PerformanceBike.com with my Team Member Discount it comes to a whopping 404, add my point discount of 3.33, and it then moves to 400.77...Wow!
I am completely depressed about this, because I wanted to ride tomorrow.  The thing is I do not want my maiden voyage to be with the WRONG STUFF, and MAKE SHIFT parts.  Will let you know what I decide....but we now the outcome already!

Wednesday, November 3, 2010

The R3 Cables and Crank Go On...with Pictures!


http://picasaweb.google.com/r.scott.tomassetti/CerveloR3BuildCableInstallation?feat=directlink

The R3 receives it's cables (temporarily), and a new crank is installed, as we get closer and closer to finishing the build.  Temporarily because new shift levers and brakes will require re cabling once they are purchased.  Between now and then, I want to be able to ride the bike a few times, so we are building it up with some parts from the tommaso. 
I was able to convince Nick that the Dura Ace 7900 that he bought did not match his new build, so I was able to installed said crank on the R3.  The crank is 170 mm, which is 5mm shorter than the Ultegra SL that it replaced.  This supposedly will enable me both the increase the ease at which I can maintain a higher cadence, and reduce hip fatigue.  I got it because of my lack of flexibility, coupled with my need to climb hills better, anything improvement would be welcomed.
Some cool accents were added to the overall look of the bike.  The red ferrules and donuts really did the trick, and matched the red nipples on the dura ace wheels sweetly.  Also the red pedals helps to tie the whole thing together.  The front brake really snaps, while the rear lags a bit still.  Compared to the Tommaso, they are light years ahead of the game.  Sondre did a great job aligning the cables in the front to run parallel to one another, really making the cables look clean upon entering the cable guides in the down tube.
I am really very pleased with the way the build is turning out.  Well put together, and just the right amount of bling!

Saturday, October 30, 2010

Introducing the Cervelo R3


Picture gallery on Picasa: http://picasaweb.google.com/r.scott.tomassetti/Cervelo_R3_Build?feat=directlink

Friday was the Cervelo R3 build at Cycling Concepts in Rocky Hill, CT. Sondre and I , mostly Sondre, placed parts and adjusted the frame to get the bike ready for the final fitting and cabling of the bike. Unlike the Tommaso build which I did myself, I choice to have it done at Cycling Concepts, as messing it up would have meant to great an expense for me. Sondre is an outstanding mechanic who knows his business, and I really wanted to learn as much as I could from him during the build process for later consumption.
The build started with me unwrapping the frame, gathering parts and putting the shifters on the handlebars. I put the front and rear Derailleurs, brakes, seat post and seat. After that I was pretty much a bystander, student, or gofer.
Once this was done, Sondre added the headset, which connected the fork to the frame. Sondre then leveled and turned the bottom bracket so the cups would screw in smoothly and evenly for better performance. He also turned the outer ring of the BB so the cups would fit parallel to each other. Once those things were done the BB cups were installed and then the Crank. I placed the new Speed Play Zero Pedal on the crank, the stem on the handlebars, and then Sondre leveled the Shifters, seat, and handlebars. Sondre adjusted both sides so the hoods would lay flat and slightly turned in for a more comfortable fit.
Once this was done I put the Dura Ace 7850SL Wheels on as the final piece to the puzzle before fitting. They match very nicely but subtlety to the bikes frame colors (White, black and red). The red nipples of the wheels will match the red nipples of the cable housing nicely. The red pedals are also a nice touch. The wheels made the R3 look more like a bike than an unfinished project, and gave my spirit a lift. It also made me anxious and ready to ride.
I still have to wait some though, as the fitting with be on Tuesday. This will determine the actual stem length we will be ordering, a Thomson X2. Once this is done, we can them put the cables on, and adjust shifting and the like. For now I am going with bar tape I already had laying about, but later will be using Deda Tape. By this time next week, she should be up and rolling. I cannot wait to go riding on the NEW CERVELO R3.
Just want to thank Sondre, Dan, and Dave for their extreme patience, and understanding my need to be involved with the bike build. I was important to me to involved with the build mechanically to feel connected to the bike, and to learn as much as I could about it mechanics for trouble shooting, maintenance or adding new parts later. By the end I will have knowledge of the bike I could never had gained from just buying one from the floor.
I have researched all the frame geometries, research and purchased most of the parts, (with Dave's helpful hand and watchful eye), helped with the build and setup of the bike, and most importantly had the final decision on all aspects of the build. I am not sure what was more fun, the research and deliberation with Nick about various part combo's and frame combo's, the build, or whether it will be the actual riding of the bike. It all works for me! I will miss the chase though.

View the picture slide show below: